Subject: cilco pathing - withdrawl and hplc transport pathing cilco needs to be pathed the following way on a withdrawl day or month the pathing that was done for december 1999 and january 2000 worked . source path destination 012 - 27049 - 05 - 001 / stg / f 012 - 27049 - 05 - 001 firm storage external bammel - meter 56 l storage account meter 56 must be attached to this pool external bammel - meter 56 012 - 27049 - 02 - 001 transport 012 - 27049 - 02 - 001 / transport / i / 1 / e meter 56 must be attached transport imbalance the hplc transport in or out of storage should be pathed as follows injection source path destination 012 - 41500 - 02 - 015 / transport / i / 1 / e 012 - 41500 - 02 - 015 external bammel - meter 57 transport imbalance meter 57 must be attached to this pool withdrawl external bammel - meter 57 012 - 41500 - 02 - 015 012 - 41500 - 02 - 015 / transport / i / 1 / e meter 57 must be attached to this pool transport imbalance