midd:traffic_scheduling:project_log [2009/05/13 17:59] afbarnard added project log entries since 04/25 from own notes |
midd:traffic_scheduling:project_log [2009/05/13 18:10] afbarnard typo: not -> now for 04/10 entry |
||
---|---|---|---|
Line 126: | Line 126: | ||
==== 04/10 ==== | ==== 04/10 ==== | ||
- | I was in the process of doing this (see above) when I could not reinstall the Sprint drivers. Looking for a new set of drivers, I found a completely revamped set from Sprint. Installing, and guess what - the NDIS adapter can not be directly seen by winpcap. Successfully sending and receiving via our software over the Sprint card to our server. | + | I was in the process of doing this (see above) when I could not reinstall the Sprint drivers. Looking for a new set of drivers, I found a completely revamped set from Sprint. Installing, and guess what - the NDIS adapter can now be directly seen by winpcap. Successfully sending and receiving via our software over the Sprint card to our server. |
==== 04/12 ==== | ==== 04/12 ==== | ||
Line 289: | Line 289: | ||
AB, PK - Met for 8 hours to implement BK scheduler, run experiments, fix bugs, rerun experiments, finish presentation. | AB, PK - Met for 8 hours to implement BK scheduler, run experiments, fix bugs, rerun experiments, finish presentation. | ||
+ | ==== 05/13 ==== | ||
+ | |||
+ | AB, BK - Give partial project presentation. Revise and condense remainder of presentation so that it fits into 10 minutes or less. | ||
+ | |||
+ | ==== 05/14 ==== | ||
+ | |||
+ | AB, BK - Finish revising presentation. |