midd:traffic_scheduling:project_log

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
midd:traffic_scheduling:project_log [2009/04/25 00:48]
perryk
midd:traffic_scheduling:project_log [2009/04/25 00:54]
perryk
Line 202: Line 202:
 AB - Prepare presentation for meeting with Suman. AB - Prepare presentation for meeting with Suman.
  
-PK - Actually early 04/25. Started from scratch last night. Finished a new server - even added graphing GUI. Architected class hierarchy and implemented round robin scheduler (since it does not require any actual capture or analysis) as a means of exercising the class hierarchy. I like it so far. Very please.+PK - Actually early 04/25. Started from scratch last night. Finished a new server - even added graphing GUI. Architected class hierarchy and implemented round robin scheduler (since it does not require any actual capture or analysis) as a means of exercising the class hierarchy. I like it so far. Very pleasedThis screen grab shows the server receiving from a SuperTcpClient with 2 (simulated) adapters with the round robin scheduler. The graph is the last 60 seconds. The dip is the current second. 
 + 
 +{{:​midd:​traffic_scheduling:​server_snap.jpg|}}
  
midd/traffic_scheduling/project_log.txt · Last modified: 2009/05/15 14:55 by afbarnard