afbarnard Added project log entries for past 2 weeks from my own notes
Line 149: Line 149:
  
 AB - Continued work on basic analysis. Unfortunately not yet ready to commit. Complications,​ bleary eyes, hazy mind, the usual suspects for excuses. AB - Continued work on basic analysis. Unfortunately not yet ready to commit. Complications,​ bleary eyes, hazy mind, the usual suspects for excuses.
 +
 +PK - Rewrite of the client UI bringing all plugins and all adapters under a single executable. Very pleased. Captured data on 3 adapters X 5 plugins simultaneously (15 data streams).
 +
 +==== 04/14 ====
 +
 +AB - Set up Mono and MySQL access from Mono.
 +
 +==== 04/15 ====
 +
 +PK - Writing HTTP plugin. Tweaks of capture code to lock resources less often and in shorted intervals.
 +
 +AB - SQL data analysis
 +
 +==== 04/16 ====
 +
 +AB, PK - Meeting to discuss progress and issues. We are slightly behind schedule. AB's fault.
 +
 +==== 04/17 ====
 +
 +PK - HTTP plugin giving me more trouble than it's worth. Recoded to hit a single web site per major interval so as to allow finer grained capture filters.
 +
 +==== 04/19 ====
 +
 +PK - A lot of data capture tests - installed and run on laptop.
 +
 +AB - Tried to dump project DBs. Decided default number of plugin subsamples. Ping analysis.
 +
 +==== 04/20 ====
 +
 +AB, PK - Meeting. Status and issues. ICMP packet lengths confusing (not adding up).
 +
 +AB - DNS analysis.
 +
 +==== 04/21 ====
 +
 +PK - Finally have HTTP plugin where it should be. Added additional capture fields as per Aubrey. ​
 +
 +==== 04/22 ====
 +
 +PK - propagated code to correctly extract payloads without control characters.
 +
 +AB - Finished client download of server data.
 +
 +==== 04/23 ====
 +
 +AB, PK - Meeting.
 +
 +==== 04/24 ====
 +
 +AB, PK - Meeting with Suman, who advises altering project direction. Thereafter, meeting with ourselves to discuss and start on new project direction. We will focus exclusively on scheduling data to multiple TCP streams from now on. Discussed necessary architecture,​ priorities, collaboration points.
 +
 +AB - Prepare presentation for meeting with Suman.
 +